Vehicle breakdown on Highway blocks traffic for 3 hours


Write Comment     |     E-Mail To a Friend     |     Facebook     |     Twitter     |     Print
By Prakash Katapadi
Bellevision Media Network

Udyavara, 28 May 2011: Traffic was blocked for about 3 hours at National Highway near Udyavara bridge due to breakdown of Tempo Tracks on Friday. In the rush traffic during the day, with the sudden breakdown of Tracks the vehicles coming from both sides had to stop and the vehicles coming from Udupi and Mangalore had to be stranded on the road for hours.

 

 

During this time the smaller vehicles somehow managed to sneak by the inner roads and passed through. But the vehicles such as busses and other heavy vehicles which had to go through its route on the highway had a difficult time and had to wait in a one and half kilometre long queue. The passengers had to pass the time on the highway cursing the Tracks driver. Later Police came to the scene and cleared the traffic, but those who were in hurry for important work were worried due to this delay.

 

 

Write your Comments on this Article
Your Name
Native Place / Place of Residence
Your E-mail
Your Comment   You have characters left.
Security Validation
Enter the characters in the image above
    
Disclaimer: Kindly do not post any abusive, defamatory, infringing, obscene, indecent, discriminatory or unlawful material or SPAM. BelleVision.com reserves the right to block/ remove without notice any content received from users.
Anil Studio
Badminton Sports AcademyBadminton Sports Academy

Now open at Al Qusais

Veez Konkani IllustratedVEEZ Konkani

Weekly e-Magazine

New State Bank of India, Customer Service Point
Cool House ConstructionCool House Construction
Uzvaad FortnightlyUzvaad Fortnightly

Call : 91 9482810148

Your ad Here
Power Care
Ryan Intl Mangaluru
Ryan International
pearl printing
https://samuelsequeira.substack.com/publish
Omintec
Kittall.ComKittall.Com

Konkani Literature World

Konkanipoetry.com
Bluechem